# What is a single-bid lot?

> For the complete site index, see [llms.txt](https://www.viran.ai/llms.txt).

Canonical: https://www.viran.ai/en/blog/what-is-a-single-bid-lot
Language: en
Author: Aaro Angerpuro
Published: 2026-10-28T00:00:00.000Z
Updated: 2026-10-28T00:00:00.000Z

A single-bid lot received exactly one bid. Poland was 52.5%. Finland was 15.3%. Across TED awards, the share was 33.1%.

**A single-bid lot is an awarded lot that received exactly one bid.** The buyer published a competition, one company submitted a tender, and the lot was awarded. The count is bids received, recorded on the award notice.

The ranking covers TED contract-award notices for the EU27 and Norway, published from October 2025 to September 2026. It uses awarded lots that have a reported bid count. Across those lots, 33.1% received exactly one bid. Poland is at 52.5%. Finland is at 15.3%, 967 of 6,337 lots, the lowest share of the 28 markets.

![Ranking of European markets by the share of awarded lots that received exactly one bid. Poland is 52.5%. Finland is 15.3%. The pooled line is 33.1%.](https://www.viran.ai/blog-figures/ted-awards/02-single-bid-share.png)

A high share means that, in that market, a large portion of awarded lots with a bid count had no second bidder. It describes the award notices. It does not say the buyer designed the documents to keep others out, and it does not say a single bid was unlawful.

## The sector changes the odds inside the same year

The same year, grouped by the 20 largest CPV divisions, splits the other way. Lab and precision instruments are at 57.2% single-bid, median one bid. Construction work is at 11.6%, median four. How to use that split before you price a bid is in [how to read competition before you bid](https://www.viran.ai/en/blog/how-to-read-competition-before-you-bid).

Where several lots sit inside one procedure, score each [lot](https://www.viran.ai/en/blog/what-is-a-procurement-lot) on its own. If the days, the evidence, and the likely number of bidders do not support a submission, that belongs in the bid or no-bid check.

A single bid and a [lowest-price award](https://www.viran.ai/en/blog/what-is-a-lowest-price-award) are separate facts. One describes how many tenders arrived. The other describes whether quality was scored. The days the buyer gave suppliers to prepare are in [what a tender response window is](https://www.viran.ai/en/blog/what-is-a-tender-response-window).

## Sources

- TED Search API v3, contract award notices (can-standard), EU27 and Norway, published October 2025 to September 2026. Awarded lots with a reported bid count. The bid count prefers TED field ` tenders `. Where that field is absent and the electronic-submission count matches the lot count, that count is used instead.
- Sector figures use the main CPV division of the procedure, for the 20 largest divisions by awarded lots with a bid count. Notices with mixed lot outcomes are excluded from the sector chart.
